Start-Up And Performance Checklist - Lennox T-Class TPA090S4S Installation Instructions Manual

Tpa series 7.5 and 10 ton
Table of Contents

Advertisement

Start-Up and Performance Checklist

Job Name
Job Location
Installer
Unit Model No.
Nameplate Voltage
Rated Load Ampacity
Maximum Fuse or Circuit Breaker
Electrical Connections Tight? -
Indoor Blower RPM
Vapor Pressure;
Leak Checked? - Properly Insulated? -
Refrigerant Lines:
Fully Opened? - Caps Tight?
Service Valves:
SEQUENCE OF OPERATION
-
Heating Correct?
Serial No.
Compressor Amperage:
Indoor Filter clean? -
S.P. Drop Over Indoor (Dry)
Cooling Correct?
Job no.
City
City
Service Technician
Supply Voltage (Unit Off)
Outdoor Coil Entering Air Temp.
Outdoor Fan Checked?
-
Voltage With Compressor Operating
Calibrated? -
-
Page 13
Date
State
State
-
THERMOSTAT
Properly Set? - Level? -
TP SERIES

Advertisement

Table of Contents
loading

This manual is also suitable for:

T-class tpa120s4s

Table of Contents