Heatilator SC60 Installation Manual page 25

Hide thumbs Also See for SC60:
Table of Contents

Advertisement

Termination Cap
Collar
2 in. (51 mm)
Minimum Height
Chase Top
Chimney
Pipe
Termination cap pipe and chimney section must overlap 1-1/2 in. (38 mm).
Figure 5.13 Installing a TS345/TS345P Square Termination Cap
Remove 2 screws
from front & back
to lift the top off
Termination Cap
Collar
2 in. (51 mm)
Minimum Height
Chase Top
Chimney
Pipe
Termination cap pipe and chimney section must overlap
1-1/2 in. (38 mm)
Figure 5.14 Installing a TCT375 Terra Cotta Cap
Place waterproof sealer under
each flange of the termination
cap and on top of each screw
to help prevent leaks.
The last section of pipe must
stop between 2 in. (51 mm)
above the top of the chase and
4 3/4 in. (121 mm) below the
top of the chase.
2 in. (51 mm)
maximum
4 3/4 in. (121 mm)
maximum
Chase
Place waterproof sealer
under each flange of the
termination cap and on
top of each screw to
help prevent leaks.
The last section of pipe
must stop between 2 in.
(51 mm) above top of
chase and 7 in. (178 mm)
below top of chase
2 in. (51 mm)
7 in. (178 mm)
Chase
Heatilator • SC60 Installation Manual • 4013-281 • Rev F • 05/06/15
Assemble
storm collar
Termination
around extended
Cap (not shown)
termination cap
pipe
once cap is
CT-3A
installed.
Caulk gaps between
storm collar & pipe,
and storm collar
& chase top.
Collar
2 in. (51 mm)
Minimum Height
Chase Top
Chimney
Termination cap pipe and chimney section must overlap 1-1/2 in. (38 mm)
Figure 5.15 Installing a DTO134/DTO146/DTS134/DTS146 Cap
Do NOT block
air holes
Storm Collar
3 clip brackets.
Slip over chase collar
and attach with screws
provided.
14 1/2 in. (368 mm)
Maximum
Chase
Pipe
25

Advertisement

Table of Contents
loading

Table of Contents