Finalizing The Installation - Travis Industries 1080 CF Installation Manual

Hide thumbs Also See for 1080 CF:
Table of Contents

Advertisement

40

Finalizing the Installation

Steps for Finalizing the Installation
1. Remove the glass (see page 42).
NOTE:
If using propane (LP) convert the appliance prior to installing the logs (see page 51
for details)..
2. We recommend you purge the gas line at this time (with the glass removed). This allows gas to
be detected once it enters the firebox, ensuring gas does not build up.
3. Install the firebacks (if applicable - see page 56) and logs (see page 43).
4. Turn on the gas to the fireplace. Turn on gas to the heater. Leak test all gas joints.
5. Replace the glass. Start the pilot.
6. Start the main burner. Leak test all gas joints again (the gas control valve and connections are
located on the exterior of the fireplace on the left side.
© Travis Industries
WARNING: Prior to removing the glass, shut off gas to the
appliance (or remove the batteries from the battery box and shut
off electricity to the fireplace). This prevents any chance of
accidental burner ignition when accessing the firebox.
4090807
(for qualified installers only)
100-01193_003

Advertisement

Table of Contents
loading

Table of Contents