Quadivator HyperCut RD62 Assembly/Operators/Parts Manual page 5

62" 5 blade
Table of Contents

Advertisement

HyperCut Mower Pre-Delivery Check List
Check off all items as they are found satisfactory or after adjustments
are made:
All safety shields and guard are securely in place!
All decals are in place and readable!
Tighten all hardware – see Checking Bolt Torque in Service Section.
Check and tighten blade holder and blade bolts – see Tightening Blade and Blade Holder
Hardware in Service Section.
Check the belt is adjusted properly – see Service Section.
CAUTION
Start the HyperCut Mower and allow it to run for 5 – 10 minutes, check for excessive
operation or unusual noise.
The HyperCut Mower has been tested and to the best of my knowledge, is ready to be
delivered to the customer!
Date Pre-Delivered –
Signature –
To help prevent personal injury from
rotating blades or thrown objects, never
walk or stand in line with the discharge
during run-in or operation!

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents