Sunbeam Cafe Series EM7100 Instruction/Recipe Booklet page 27

Plus multi-capsule
Hide thumbs Also See for Cafe Series EM7100:
Table of Contents

Advertisement

Descaling Cycle for both the Coffee and Steam Thermoblocks
12. The espresso machine will repeat
the pumping and rest cycles for
13 times for both the STEAM and
ESPRESSO thermoblocks. This will take
approximately 17 minutes.
13. At the completion of the 14 cycles the
espresso machine will start to beep and
the 1 CUP button will flash.
14. Remove the water reservoir, empty and
rinse thoroughly with cold water. Also
empty the container under the group
head and steam wand and place back
into position.
15. Refill the water reservoir with clean,
cold, fresh water and place back into the
espresso machine.
16. Activate the descaling process by
pressing the 1 CUP button once.
17. The pumps for both the STEAM and
ESPRESSO will start to pump clean water
through for approximately 1-2 minutes.
Once again the lights on the control
panel will start to chase from left to right.
18. At the completion of the cycle the
espresso machine will beep 4 times and
will go into STANDBY MODE.
25

Advertisement

Table of Contents
loading

Table of Contents