Midea MFGA-60ARDN1-QC2 Service Manual page 26

Floor standing type
Table of Contents

Advertisement

6). Set the 3-way valve to the closed position immediately
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.
Disconnect the charge set, and tighten the 2-way and 3-way valve's stem nuts.
Use a torque wrench to tighten the 3-way valves service port cap to a torque of 1.8 kgf.m.
Be sure to check for gas leakage.
2. Air purging by the refrigerant
Procedure:
1). Confirm that both the 2-way and 3-way valves are set to the closed position.
2). Connect the charge set and a charging cylinder to the service port of the 3-way valve.
Leave the valve on the charging cylinder closed.
3). Air purging
Open the valves on the charging cylinder and the charge set. Purge the air by loosening
the flare nut on the 2-way valve approximately 45' for 3 seconds then closing it for 1
minute; repeat 3 times.
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents