Midea MFGA-60ARDN1-QC2 Service Manual page 14

Floor standing type
Table of Contents

Advertisement

Capacity
Btu/h
MFGA-60ARDN1-QC2
Caution:
Capacity is base on standard length and maximum allowance length is base of reliability.
Oil trap should be installed per 5-7 meters.
5.3.2
Piping connection
5.3.2.1 Connecting Of Refrigerant Pipe
a)
Only the correctly installing of indoor and outdoor unit done, can the refrigerant pipe
be connected.
b)
The cut-off valves are completely close before ex-work. Before connecting the
refrigerant pipe, be careful to check whether the valves are completely close.
c)
The connecting procedure of refrigerant pipe: first, unscrew the two valves on the
outdoor unit and the pipe-jointing nut on the indoor unit(please keep them care fully).
Please connect the refrigerant pipe according to the manual, the pipe-jointing nut should
be screw tightly and no leakage. Note: you need two wrenches to make balance.
d)
When the connecting of refrigerant pipe is finished, before power on the system, you
Pipe size
Standard
length
Gas
Liquid
(m)
5/8''
3/8''
(Ф16.0)
(Ф9.52)
11
Max.
Max.
Elevation
Length
B (m)
A (m)
5
15
Additional
refrigerant
(g/m)
30
40

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents