Samsung SCD180 Service Manual page 129

Hide thumbs Also See for SCD180:
Table of Contents

Advertisement

1. 동작 영문 2001.7.4 2:4 PM 페이지1-14
Operation
1-4-2 Loading
✽ This operation makes tape loading.
Gear Connecter,
Gear Loading S
and T rotate.
Arm Loading S,T
move in direction of
arrows and pole
Base S,T silde.
Pole Base S,T
attach to Base
Drum.
Pinch Roller attaches
to Capstan Shaft.
Pinch Roller
rotates in reverse.
Pinch Roller
rotates forward.
Pinch Roller rotates
via Silder Main and
detaches from
Capstan Shaft.
1-14
Housing down.
Motor Loading rotates.
Gear Worm Loading Motor
Gear Worm Loading
Gear Wheel
Gear Mode switch
Gear Cam Main rotate.
Chassis Sub moves
in direction of
Arm Tension, Arm
Review and Arm
Pinch Roller move.
Chassis Sub stops
complete position
Brake S released
Motor Loading
from Reel S.
Motor Loading
Brake T
rotates in reverse
released from
and then stips.
Reel T.
When Moror Loading
is in reverse, Silde
Main moves to right.
Brake S,T are
operated by Main
Motor Loading
Silde and contact
rotates reverse
Reel S,T for braking
and then stops.
Cassette in
Drum rotates.
arrow.
at Loading-
stops.
Drum stops.
Motor Capstan rotates.
Gear Capstan, Belt
Timing, Clutch and
Gear ldler rotate in
order.
Reel T rotates.
Motor Capstan stops.
Motor Castan rotates
silghtly(for shifting idler to
Reel S)and then stops.
Motor Capstan rotates
back.ward silghtly and
forward.
Reel S, rotates.
Motor Capstan stops.
Samsung Electronics

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vp-d190msVp-d190msi

Table of Contents