Omega VRT400 User Manual page 17

Hide thumbs Also See for VRT400:
Table of Contents

Advertisement

BOWL pACKING ASSEMBLY
1
Bowl
Packing
2
3
As shown to the left in the dotted circle,
let the protrusion part on the bowl
packing face upward and hold it, like
pinching, with your thumb and index
finger.
• Insert the bottom of the bowl packing
into the bowl hole and fully press it
down.
• Do not insert whole part of bowl
packing.
• The upper part of the bowl packing
must be shown.
If the bowl packing at the bottom of the
bowl is not fully inserted and bent, set it
into place with the rotating end of the
cleaning brush.
15

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VRT400 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents