Zgu36K Combination Cutout; Zgu385 Combination Cutout - Monogram ZVB36 Installation Instructions Manual

Downdraft vent systems
Hide thumbs Also See for ZVB36:
Table of Contents

Advertisement

ZGU36K GAS COOKTOPS WITH 36" VENT
21-3/4"
Cutout
34" Cooktop and Vent Cutout
Depth
13/16" Cooktop Overlap
(1-1/2" at Center)
Front Edge
Clearance to Cutout
of Countertop
Countertop Cutout: Requires 23-1/2" min. fl at countertop
surface. Requires 25" min. total countertop depth.
ZGU385 GAS COOKTOPS WITH 36" VENT
3/8"
21-11/16"
Cutout
Depth
7/16" Cooktop Overlap
(1-1/4" At Center)
Front Edge
of Countertop
Countertop Cutout: Requires 23-5/16" min. fl at countertop
surface and 25" min. total countertop depth.
Installation Preparation
2-1/4" Min. Cooktop Cutout to Rear
Vertical Combustible Surface
36"
23-3/8" (B,W)
2-1/2" Min.
6" Min. Cutout
to Side Walls
3-3/8" Min. Cooktop Cutout to Rear
Vertical Combustible Surface
3/8"
36-3/4"
34"Cooktop and
Vent Area Cutout
2-1/2" Min.
Clearance to Cutout
12" Min. Cutout
to Side Walls
1/4" Overlap
1/8" Gap
23-1/2" (SS)
Total Flat
Surface
Required
at Center
1/4" Overlap
1/8" Gap
23-5/16"
Total Flat
Surface
Required
8
2-1/2" to
Cutout
ZGU36
20-1/16"
3/4"
Vent
22-3/4" Inside
22" to Support Rail
Cabinet: Requires 22-11/16" min. inside
cabinet depth. Remove rear support rail.
2-1/2" to
Cutout
ZGU385
20-1/16"
3/4"
Vent
22-3/4" Inside
22" to Support Rail
Cabinet: Requires 22-11/16" min.
inside cabinet depth. Remove rear
support rail.
1-7/8"
3/4"
Thick
Support
Rail
1-7/8"
3/4"
Thick
Support
Rail

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zvb30

Table of Contents