abc 23kW SUPER VULCANO User Manual page 17

Table of Contents

Advertisement

A
B
C
D
E
1
2
3
4
5
6,8,9
7
10
Prior to the stove first ignition make sure that:
§
All tools are removed from the stove (user manual, power cable)
§
The stove is connected to the pipeline and filled with water
§
The air vent cover under the stove cover is open
§
The flue outlet is connected to the chimney
§
The door is closed and the ash trap is place
§
The hopper is loaded with pellets
(Figure 6.)
Safety valve
Outlet line
Connection for the flue pipe
Return line
Connection for the fresh air supply
Safety valve discharge drain
Thermometer
Pressure gauge
Balance valve
Thermostatic mixing valve 55°C
Valve
Installation refilling system
Drain to the sewer
15
3bar
Hot water
Ø 120mm
Cold water
Ø 60mm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents