Radiant Floor System Installations - Central Boiler Pallet Burner Dual Fuel Owner's Manual

Outdoor wood furnace
Table of Contents

Advertisement

Radiant Floor System Installations

Installing radiant floor (ceiling) heating is a very viable
heating option when either remodeling or building new.
Radiant floor heat can also be added easily if the floor
joists are exposed (as in an unfinished basement). Tubing
may be installed in a wide variety of configurations and
locations including, but not limited to, the following:
• In a concrete slab
• Within the subfloor system (e.g., Gyp-Crete
• Within the floor joist system
• Within the walls or ceilings
When installing tubing between floor joists (16" on center)
run two 1/2" tubes between each joist. Insulate below the
tubing to prevent excessive heat in the lower level.
Proper insulation is key to effective radiant heating
and controlling large heat demands. Heat from this
type of system radiates equally in all directions. As
an example, if tubing is installed in a slab, the ground
below the slab must be dry and well-insulated. If not
properly insulated, nearly 50% of the heat will be
wasted warming the ground below the slab. Two inches
of blueboard insulation is recommended. Two 1" layers
of blueboard can be used. This allows lapping of the
joints in the 4' x 8' sheets.
NOTE:
Do
not
use
polystyrene),
bubble
insulation.
NOTE: A minimum of one inch of insulation should
be used. Two inches of insulation and vapor
barrier below the insulation is recommended.
Fig. 29
NOTE: If the temperature of the
concrete slab is below freezing
(32˚F), there must be adequate
antifreeze in the system, or the
slab must be pre-heated, before
water is circulated through the
radiant slab system.
Vapor Barrier
Slab
Insulation
Slab on grade
Wire
Mesh
2" Blueboard Styrofoam
®
is recommended (minimum
®
of 1" Blueboard Styrofoam
).
26
)
®
beadboard
(expanded
foil
or
roll-out
foam
Radiant Floor Heat
(For Slab on Grade or Basement)
Hot Supply Return
Areas with high water tables need to be prepared
properly to prevent contact between the ground water
and insulation.
For examples of radiant heating systems using 1/2"
tubing in the loops, refer to Fig. 29 through Fig. 32.
The spacing of each circuit should be 12" between tubes.
The water circulates in opposite directions to provide an
even distribution of heat. The mixing valve regulates
the temperature of the water circulating through the
loops by mixing return water with the hot supply water.
In applications where high heat loss is expected, loop
spacing may be reduced to 10" or less. If additional
information is desired, contact your dealer.
NOTE: The longer the loop length, the lower the
flow rate and the lower the heating capacity.
Loop lengths greater than 350 feet (107 m) are
not recommended.
NOTE: The temperature of the water used in
radiant heating should be determined by the
installer in accordance with the application.
NOTE: It is not uncommon that it can be very
difficult to get a concrete slab up to temperature
in late fall or early winter in a new building that
is not completely sealed and not well insulated.
Once the building is completely sealed and well
insulated, bringing the slab up to temperature
can still take a considerable amount of time and
wood; however, once warm, wood consumption
will be reduced if the concrete slab and building
are insulated properly .
NOTE: For zone installations, refer to Fig. 30
(multi-zone) or Fig. 32 (single zone).
Section 1 - Furnace Installation
Ground
Plate
Level
Basement
Insulation
Slab
Insulation
Footing
Poly Vapor
Soil/Sand
Barrier
Insulation
Slab
Plate
Ground Level
Insulation
Poly Vapor
Barrier
Footing
Soil/Sand
© 2013 Central Boiler