Fer Falcon 47-26701 Installation, Servicing And User Instructions Manual page 12

Copper wall-mounted combination, gasa fired boiler for central heating, and domestic hot water production
Table of Contents

Advertisement

INDUSTRIE
CLEARANCES:
* 600mm minimum clearance for servicing access
Terminal Position
POSITION
MINIMUM SPACING
A
Directly below an openable window, air vent, or any other ventilation opening
B
Below gutters, soil pipes or drainpipes
C
Below Eaves
D
Below a Balcony
E
From vertical drainpipes or soilpipes
F
From internal or external corners
G
Above adjacent ground or balcony level
H
From a surface facing the terminal
I
Facing another terminal
J
From opening (door/window) in carport into dwelling
K
Vertically from a terminal on the same wall
L
Horizontally from a terminal on the same wall
N
Below carport
A Quinnel Barrat and Quinnel guard (part. No. C2) should be screwed to the wall centrally over the terminal, when the
terminal height is less than 2 m from floor level.
12
5 min.
Fig. 11
FALCON
400
5 min.
Fig. 12
360
50 mm
600* min.
mm
300
75
100
100
75
100
100
600
1,200
1,200
300
300
600

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents