Section 4 - Installation; Installing Welding Generator; Connecting The Battery - Miller Electric Big Blue 600D Owner's Manual

Miller electric owner's manual welding engine driven welding generator big blue 600d
Table of Contents

Advertisement

4-1. Installing Welding Generator

Movement
Y Do Not Lift Unit From End
OR
Grounding
Electrically bond generator frame to
vehicle frame by metal-to-metal
contact.

4-2. Connecting The Battery

OFF
RUN
START
Tools Needed:
SECTION 4 – INSTALLATION
Airflow Clearance
18 in
(460 mm)
18 in
(460 mm)
1
GND/PE
Y Connect Negative (–)
Cable Last.
+
1/2 in
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
2
3
install1 7/02 – Ref. ST-800 652 / Ref. ST-800 477-A / ST-158 936-A / S-0854
Location
OR
Y Always
securely
fasten
welding
generator
transport vehicle or trailer
and comply with all DOT and
other applicable codes.
Y Always ground generator
frame to vehicle frame to pre-
vent electric shock and static
electricity hazards.
Y If unit does not have GFCI re-
ceptacles,
use
protected extension cord.
1
Equipment Grounding
Terminal (On Front Panel)
2
Grounding Cable (Not
Supplied)
3
Metal Vehicle Frame
Connect cable from equipment
ground terminal to metal vehicle
frame. Use #10 AWG or larger
insulated copper wire.
ST-153 654-B / Ref. SD-131 784-A / Ref. S-0756-B
OM-481 Page 13
onto
GFCI-

Advertisement

Table of Contents
loading

Table of Contents