Preparations for boiler installation
For on-site preparation of gas, water and electrical connections, see
installation instructions, installation template or mounting frame.
A Heating flow Rp¾"
B DHW Rp½" (gas fired combination
boiler)
DHW flow G¾" (gas fired boiler)
C Gas connection
D Cold water Rp½" (gas fired combi-
nation boiler)
DHW return G¾" (gas fired boiler)
E Heating return Rp¾"
F Fill & drain valve
G Cable arrangement area
H Dimension for installation with
DHW cylinder below the boiler.
K Condensate drain
5