Operation; Maintenance; Storage; To Remove Dozer From Tractor - Sears GT 16 Owners Mnaual

Hide thumbs Also See for GT 16:
Table of Contents

Advertisement

[
OPERATION
INSPE CT THE AREA TO BE WORKED
CAR EFULLY BEFOR
E
OPERATING
THE
DOZER
BLAOE
.
A
V
OID
PIPES,
ROOTS,
CURBS
OR OTHER HEAVY
OBSTRUC·
TIONS
.
1.
St art
tractor engine and
raise
the blade t
o the
highest
"transport"
position. Move blade to desired angle and
lower
blade to ground.
2
.
Shift the Hi· Lo Range Shift Lever to Low Range,
(on
tracto
rs so equipped). Place t
ract
or Shift
Lever
in Low
and ease
into
the
material
to
be
moved.
Increase
tracto
r
speed gradually
to
su
it
working conditions
and
operat
ions
being performed.
A LWAYS
LOWER BLADE TO GROUND
BEFO RE LE AVING T RACTOR
.
TO REMOVE DOZER
FROM TRACTOR
1.
Remove Retainer
Spring
and
Clevis Pin from
Lift
Tube
and Lift Lever Pivot
A ssembly
(Fig.
10).
2.
Depending
on your type
of
tractor:
Remove the Nuts,
Washers
and
Bolts
from the
Lift Moun
ing
Plates, tractor Frame
and
Foot
Rests (Fig. 9) .. OR
.
Remove the Nuts, Washers and
Bolts from
t he Lever
Pivo
t
Brackets, tractor Chassis
and Foot Rests (F ig.
8). In
either
case
,
replace
hardware.
3.
Remove Retainer Springs-
from
Blade
Control
Rod
and
Latch
Control Rod
(Fig. 16). Remove
Rods
from Rod
Guide
Assembly.
4. Remove the Retainer Spring
in
Mounting
Rod
at L.H.
side
of
Dozer
(Fig. 12).
Sl
ide
Mounting
Rod
from Front Mount·
ing
Bracket
and Dozer
Mounting Bracket
Assembly.
NOTE
:
FRONT
TRACTOR WHEELS MAY
NEED
TO
BE
TURN-
ED
TO THE
RIGHT.
5.
Lift
Dozer
Mounting
Bracket up so
Mount ing Pins are free
of Front Mounting
Bracket
slots
(Fig. 12)
.
6
.
Ret
ainer
Spring
and
Clevis
Pin
may
be
removed
f
rom
Front
Tube
Assembly (Fig
.
12),
or
Dozer pulled forward to free
Dozer from Tractor.
.
9
-
BLADE
ASSEMBLY
SCRAPER
BAR
O
~===:::::::CARRIAGE
BOLTS,
LOCKWASHERS
AND NUTS
FIGURE 23
MAINTENANCE
During
t
he operating season, check
all
bolts, nuts and retainer
springs
t
o be
sure
t
hey
are
secure.
For better snow removal
performance, coat
the blade w ith automobile type paste wax.
This
will permit
t
he snow
t
o
sl
ide
off the blade easier.
LUBRI
CATION
Oil
all
pivot
points
so
that
t
hey will work
f
reel
y
.
A
pply a light
grease to f
ront and rear Pivot Shafts (F
ig's.
11 and 12).
SCR
APER BA
R
After
extensive
use, the
Scraper
Bar
may
be reversed
to
util
ize
the
unused edge (Fig. 23).
1. Remove
the
six
Nuts
, Lockwashers and Carriage Bolts in
the Scraper
Bar
and
Blade Assembly
.
2. Reverse Scraper
Bar
and
secure
t
o
Blade
A
ssembly wi
t
h
Bolts, Lockwashers and Nuts previously removed.
Head of
Carriage Bolts
t
o
outside
of
Blade
.
STORAGE
When
t
he Dozer is not being
used
,
rem
ove
all
dirt
and rust
and
touch up with paint
.
Apply
a light
coat
of
grease
or rust
prevent
ative
to
the blade
and
oil
pivot
points.
Store in
an
area where it is
protected from
wea
ther.
Sears,
Roe buck and
Co.
reserves
t
he righ
t
t
o ma
ke
any
changes
in design
or improvement
s w
it
hout imposing
any obl
igati
on to
install the same upon
its
it
ems
heret
ofore
manuf actured .

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents