Operation Panel Unit And Document Size Sensor Board - Sharp SF-2030 Service Manual

Table of Contents

Advertisement

8. Operation panel unit and document
size sensor board (light receive side)
Operation
panel
Open the front panel.
1
Remove the middle panel (5 screws).
2
Remove the glass holding plate and front frame side right
3
and left side screws (5 screws).
Remove the screws that hold the magnetic catch plate
4
(one each on two locations).
Remove the operation panel unit.
5
Remove the operation
panel from the operation panel
6
unit (15 screws, 6 connectors).
A
1
B
5
Document size sensor
board light receive side
Remove the document
7
size sensor board ( screw).
2
3
4
LCD unit
Remove the LCD control PWB from the operation panel
8
unit. (2 screws, 4 connectors)
Remove the LCD control PWB mounting angle from the
9
operation panel unit. (2 screws)
Remove the operation PWB from the operation panel unit.
10
(9 screws)
Remove the LCD unit. (4 screws, connector)
11
C
7
6 – 16

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sf-d20Sf-d21Sf-dm11

Table of Contents