Download Print this page

Advertisement

TEA BREWING
STEP 1
Begin each brew cycle with
a clean, empty funnel and
server. Insert a BUNN
filter
®
into the funnel if using loose
tea leaves.
CLEANING COFFEE AIRPOT
STEP 1
Open the airpot by press-
ing the buttons located on
either side of the nozzle and
lifting.
STEP 1
Once a month, replace the
faucet seat cup (B.O.M.
#00600.0000). Discard the
old seat cup.
DO NOT KEEP BREWED BEVERAGES OVERNIGHT
36846.0000D
09/08 ©2004 Bunn-O-Matic Corporation
BREWING INSTRUCTIONS
STEP 2
Lay a packet of fresh tea leaves
into the funnel or loose tea
leaves into filter. Level the bed
of leaves by gently shaking.
Slide the loaded brew funnel
into the funnel rails until it
stops.
STEP 2
Remove the pump tube as-
sembly.
MONTHLY CLEANING INSTRUCTIONS
STEP 2
The faucet assembly (B.O.M.
#03260.0001) can be ordered
for replacement.
ITCB
STEP 3
Make sure the ON/OFF switch
is ON. Press the switch of the
desired batch size. Press the
Brew Switch (A, B, or C) as-
signed to the desired product/
recipe.
STEP 3
Thoroughly rinse the entire
server.
STEP 4
When tea no longer drips
from the funnel tip, carefully
remove the brew funnel and
discard the used tea leaves.
Press the ON/OFF switch to
OFF to prevent a false start.
Thoroughly clean and sanitize
the brew funnel and funnel
tip screen.
STEP 4
Use a clean damp cloth rinsed
in mild, non-abrasive deter-
gent to clean all surfaces.
STEP 5
Fresh tea is available at the
faucet. Drain the reservoir
before starting another brew
cycle.
36846 092208

Advertisement

loading
Need help?

Need help?

Do you have a question about the ITCB and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Bunn ITCB

  • Page 1 ON. Press the switch of the from the funnel tip, carefully faucet. Drain the reservoir leaves into filter. Level the bed server. Insert a BUNN filter desired batch size. Press the remove the brew funnel and before starting another brew ®...
  • Page 2 ITCB DAILY CLEANING INSTRUCTIONS CLEANING TEA RESERVOIR STEP 1 STEP 2 STEP 3 STEP 4 STEP 5 Turn the faucet in a coun- Transfer these parts to a three Use a bristle brush (BOM Allow the parts to soak in a...