Magic Chef MCKC490B2 User Manual page 10

Table of Contents

Advertisement

bottom cabinet. (See Figure 6)
Grasp the keg handles and slide it all the way into the cabinet.
Fig. 4
Installation Of The Keg Coupler
Insert the keg coupler provided into the locking neck of the beer keg and turn it clockwise to lock
into position, making sure the keg coupler is in the closed position. (See Figure 7)
Installation Of The CO2 Air Line Hose
Attach the end of the air line(red) hose provided to the hose connection on the keg coupler.
Secure hose by using the clamps and make sure there are no leaks.
Connecting the beer tower to coupler
Make sure the washer is properly inserted into the wing nut.
Place wing nut into the top of the coupler turning until tight.
How To Tap A Keg Of Beer
Make sure the beer tower faucet is in the closed position.
Pull tapping handle out and press downward until it locks into position. (See Figure 8) The keg is
now tapped.
Opening The CO
Cylinder Main Valve
2
Before doing that, make sure the secondary shut-off valve is closed, as shown in figure 9. To
open the main CO
2
Notice the needle on the gauge start to climb.
Adjusting The CO
Regulator
2
The gauge monitors low internal keg pressure and should be adjusted to read between 10-12 psi.
(See Figure 10)
In order to do that:
1.
Release adjustment lock nut marked 2.
2. Using a flat screwdriver, turn regulator screw marked 3. If increased low pressure is sought,
rotate screw clockwise. By rotating it counter clockwise, low pressure will be decreased when
the required operating pressure is attained, retighten lock nut 2.
3. Open secondary shut off valve to let CO
cylinder valve, slowly turn the main valve counter-clockwise until fully open.
Fig. 5
flow into the keg.
2
10
Fig. 6

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MCKC490B2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Mckc490s2

Table of Contents