Test Running

1. Turn on all the DC wiring switches, and confirm that "d-47" is displayed on the LCD display. If "d-
47" is not displayed, the DC connections are incorrect. Check the polarity of all the DC wiring.
2. Turn off the AC&DC disconnect switches, and wait for 5 minutes to avoid the risk of electric
shock.
3. 5 minutes after the AC&DC disconnect is turned off, insert the GDFI fuse to the fuse socket. And
then turn on the AC&DC disconnect switches.
4. "d-47" will be displayed again. To clear previous error message, press "POWER" and "DISPLAY
MODE" buttons of the solar power conditioner display simultaneously. Then "CLEAR" will be
displayed for 5 seconds, and only "STOP" is displayed. If "d-47" is displayed again, the GDFI fuse
may be blown because some of the DC connections are incorrect. Check the polarity of all the DC
wiring.
5. Press "POWER" button of the solar power conditioner display for more than 2 seconds. Then,
"STAND-BY" is displayed, and the solar power conditioner starts the operation. "GRID-
CONNECTED", "RUN", and the value of the output power are displayed.
6. If the operation is confirmed, press "POWER" button for more than 2 seconds to stop the solar
power conditioner.

Reinstalling Lower Front Panel

WARNING
The lower part of the front panel should be installed to avoid fire, smoke or malfunction from moisture.
1. Hang upper hook of the lower front cover onto the lower hook of the upper front cover; then
lower side of the lower front cover may be snapped closed.
1
2
2. Tighten four screws again. Do not tighten too much to avoid damage to the paintwork.