Changing Operating Parameter - Sharp JH-3500U Installation & Operator's Manual

Grid - interactive 1-phase inverter for photovoltaic system
Table of Contents

Advertisement

CAUTION
The following operation includes the changing of the trip points of voltage or frequency. Never open the front cover of the
solar power conditioner display except by an authorized installer.
• To change the trip points, follow the instructions below.
• Perform changes while PV module is generating power during the daytime of a sunny day. Refer to the table on page 28 of the
value. The default value is designated by bold character.
1. Stop the power conditioner manually.
Press "POWER" button if it is operating.
"STOP" will be displayed on the display.
SOLAR POWER CONDITIONER DISPLAY
POWER
BACK
LIGHT
RESET
2. Remove the front cover of the display.
Refer to page 22.
3. Slide the both of two dip switches to "SVC" position with a narrow tool.
The first parameter number and its value appear on the display. If the display continues to
indicate "STOP", one or both switches are left in INV position. In this mode, do not press "POWER"
button! ("POWER" is not indicated on the display. See below figure.), do not make the solar power
conditioner start operating. Confirm the both switches are in "SVC" position.

Changing Operating Parameter

DISPLAY
CO
2
MODE
24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents