Stand-Up H240 Hba Cable Option - HP ProLiant DL580 User Manual

Gen9
Hide thumbs Also See for ProLiant DL580:
Table of Contents

Advertisement

Install blanks in unused drive bays.
10.
Connect each power cord to the server.
11.
Connect each power cord to the power source.
12.

Stand-up H240 HBA cable option

CAUTION:
precautions before beginning any system installation. Improper grounding can cause electrostatic
discharge.
To install the component:
Power down the server (on page 25).
1.
Remove all power:
2.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Remove the server from the rack (on page 25).
3.
Remove the access panel (on page 28).
4.
Disconnect the existing SAS cable from the SPI board and drive backplane.
5.
Install the Mini-SAS cable.
6.
Connect the cable to the host bus adapter by attaching the cable end marked Port 1I to the upper
a.
connector on the HBA, and then attaching the cable end marked Port 2I to the lower connector on
the HBA.
To prevent damage to electrical components, take the appropriate anti-static
Hardware options installation 68

Advertisement

Table of Contents
loading

Table of Contents