Fujitsu PRIMERGY RX200 S6 Operating Manual page 53

Hide thumbs Also See for PRIMERGY RX200 S6:
Table of Contents

Advertisement

Inserting the server
I
For the Japanese market:
Refer to "はじめにお読みください" for more detailed explanation and for
other support systems.
1
Figure 7: Inserting the server
V
CAUTION!
Ensure that the safety lock has been inserted before the server is
inserted (see
V
CAUTION!
At least two people are needed to position the server in the rack.
(For the Japanese market, please refer to " 安全上の注意およびその他の
重要情報 ".)
Ê Extend the telescopic rails completely to the front (1).
I
They must click into place so that they can no longer be moved.
Ê Insert the prepared server into the protruding interior telescope rails (2) until
the rails engage.
Ê Release the locking mechanism of both telescopic rails - see (3a) for fully
extending rails and (3b) for partially extending rails.
Ê Push the server as far as it will go into the rack (4).
RX200 S6
3b
3a
2
figure 5 on page
51).
Operating Manual
Hardware installation
4
5
5
4
53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents