Slot 1 (If slot 2 and 3 are both unavailable, install the the M.2 SSD enablement board in slot 1.)
o
Install the PCI riser cage (on page 24).
8.
Connect the SATA cables to the SATA connectors on the system board.
9.
For cable routing, see "M.2 SSD SATA cabling".
Install the access panel (on page 22).
10.
Do one of the following:
11.
Slide the server into the rack.
o
Install the server into the rack
o
Power up the server (on page 17).
12.

Front USB 3.0 option

The front USB 3.0 option can only be installed in the eight-bay configuration.
("Installing the server into the
rack" on page 30).
Hardware options installation 77