Wall Penetrations - Rinnai RHFE-750ETR Installation Manual

Power flued flamefire space heater co-axial flue system
Hide thumbs Also See for RHFE-750ETR:
Table of Contents

Advertisement

It is critical that any wall penetrations are located correctly.
The enclosure dimensions specified are critical to the successful installation of this appliance
and MUST BE strictly adhered to.
CAUTION
Ensure there are no wall studs, noggins, wiring or other obstruction within the wall cavity where
the flue is proposed to penetrate.
Ensure the location of the flue terminal can comply with the requirements of AS5601. Figure 5.3
from AS5601-2004 and additional information is shown on page 2.
Especially relevant is the requirement to have a minimum of 300mm clearance between the flue
terminal and the finished ground level. It is not permissible to excavate a hole to obtain the
required 300mm clearance, unless there is sufficient drainage provision.
Ensure the penetration points are marked accurately as this is critical for successful appliance
installation.
The penetration for the flue pipe only needs to be made for 'Direct' and 'Direct Extended' flue
installations, where the flue terminal is located directly to the rear of the appliance.
If no flue pipe penetration is required the markings are still useful for indicating the correct
position of flue exhaust connection of 'Sideways', 'External Wall', 'Internal Wall' and 'Under Floor'
flue applications.
When creating penetrations for flue system installations other than 'Direct' and 'Direct
Extended' the minimum diameter required for the wall penetration of PVC external pipes is 80mm.
IMPORTANT
On all 'Sideways' and 'Under Floor' flue applications, allow for a continuous 2° fall from the
heater connection point to the wall terminal.
ii
i
A
iii
ii
i
iii
iv
(See detail AA)
Rinnai Australia

WALL PENETRATIONS

1. Select the desired location i for the Heater.
2. Find the vertical centre line of the appliance ii and mark this
location on the wall.
3. Mark off a point iii that is A 378mm to the left of the centre line
and B 580mm from the base.
4. Make a 100mm penetration iv at point iii.
The penetration
horizontal plane, however the penetration can be plus or
IMPORTANT
minus 25mm in the vertical plane (see detail AA).
25mm
100mm
25mm
6
iv
MUST BE aligned accurately in the
i
iii
Detail AA
iv
378mm from Centre-Line
ASP Flue Installation Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents