Before Installation
Pre-plumbing Fig. 14
To remove only the Wall jig
slide banding to the edge
and open flaps.
SNAP OFF
Fig. 14a
130mm
For Side Flue Exit
Fig. 15
3/4" BSP
Connections
Heating Flow
Fig.16
36
EcoBlue Plus Combi
Slide the wall jig out of
carton then close the flaps.
Slide banding back on.
LIFT HERE
BOTH SIDES
Part No. 7212143
116mm Dia Minimum
Aperture For Flue Tube
Side Flue
175 mm
Centre Line
Minimum
Clearance
Vertical Flue
228 mm
Centre Line
Boiler Wall Mounting Plate
Fixing Slots
Ø 8 mm
50 mm
Profile of
Outercase
5 mm Minimum
5 mm Minimum
Side Clearance
Side Clearance
Condensate
Pressure
200 mm
Drain
Relief
Recommended
Valve
150 mm
Minimum
(15mm)
Clearance
26.5
38.5mm
mm
65 mm
65 mm
65 mm
65 mm
65 mm
162.5 mm (PRV)
Heating
Heating
Hot Water
Gas
Cold Water
Inlet
Return
Flow
Outlet
Inlet
(22mm)
(22mm)
(22mm)
(15mm)
(15mm)
Combi Only
Combi Only
Not System
Not System
Part No. 7212143 DRAFT A
Wall Template
Fig. 17
5.5
Unpacking & Initial Preparation
5.5.1

Unpacking

RISK ASSESSMENT - Before commencing the
installation it is recommended that the 'Five Steps to
Risk Assessment' document published by the HSE is
consulted, and an assessment performed as described.
GAS SUPPLY - The gas supply, gas type and pressure
must be checked for suitability before connection.
1. See 'Section 2.3.1 Handling' before unpacking or lifting the
boiler.
2. Follow the procedure on the carton to unpack the boiler or see
Fig. 14a.
3. If pre-plumbing (Fig. 14) - the wall jig and fitting kit can be
removed without removing the carton sleeve. Simply slide
banding to the edge and open the perforated flap, lift out the jig,
fitting kit and instructions. If the boiler is to be install at a later
date, close the flap and reposition the banding straps, the boiler
can now be store safely away.
A small amount of water may drain from the boiler in the
upright position.
5.5.2

Initial Preparation

1. After considering the location position the fixing template on
the wall ensuring it is level both horizontally and vertically.
2. Mark the position of the fixing slots for the wall jig indicated on
the template.
3. Mark the position of the centre of the flue hole (rear exit). For
side flue exit, mark as shown (Fig. 15).
4. If required, mark the position of the gas and water pipes.
Remove the template (Fig. 17).
5. Cut the hole for the flue (minimum diameter 116mm).
6. Drill the wall as previously marked to accept the wall plugs
supplied. Secure the wall jig using the fixing screws.
7. Using a spirit level ensure that the wall jig is level before
finally tightening the screws (Fig. 16).
8. Connect the gas and water pipes to the valves on the wall
mounting plate using the copper tails supplied. Ensure that the
sealing washers are fitted between the connections.
Fit the filling loop as described in the instructions
supplied with it.
5.5.3

Flushing

1. Flush thoroughly and treat the system according to guidance
given in B.S. 7593.
7219706 - 01 (04/15)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecoblue plus combi 33Ecoblue plus combi 24

Table of Contents