Maintenance; General & Service Message - Baxi EcoBlue Plus Combi 28 Installation And Service Manual

Gas fired wall mounted condensing combination boiler
Hide thumbs Also See for EcoBlue Plus Combi 28:
Table of Contents

Advertisement

10

Maintenance

10
Maintenance
'Service Due' Message
After 11 months operation the 'Service Due' message
will be shown on the boiler display. (If the installation has
been subject to prolonged electrical isolation or power cuts
this period may be longer than 11 months) Once the service
has been completed satisfactorily the 'Service Due'
message can be reset or de-activated.
To Reset or Disable
1. Press
&
seconds. Using
Press
,
or higher will be displayed.
2. Press
to scroll to
R
press
to return the display to normal.
3. To disable the
is displayed instead of
WARNING
When changing components ensure that both the
gas and electrical supplies to the boiler are isolated
before any work is started. When the component has
been changed recommission the boiler as described
in Section 7.
Always examine any seals or gaskets, replacing
where necessary. The Case Front Panel MUST seal
effectively against the boiler side panels.
Flue Sampling
Point
Air Sampling
Point
After refitting the sampling
point plug ensure there is no
leakage of products
52
EcoBlue Plus Combi
for 6 seconds then press
scroll through until
is displayed.
. Confirm with
function keep
pressed until
.
10.1 General
1. For reasons of safety and economy, it is recommended that
the boiler is serviced annually. Servicing must be performed by a
competent person in accordance with B.S. 7967-4.
2. After servicing, complete the relevant Service Interval Record
section of the Benchmark Commissioning Checklist at the rear of
this publication.
for 6
During routine servicing, and after any maintenance or
change of part of the combustion circuit, the following
must be checked:-
then
• The integrity of the complete flue system and the flue seals
by checking air inlet sample to eliminate the possibility of
recirculation. O 2 20.6% & CO 2 < 0.2%
• The integrity of the boiler combustion circuit and relevant
seals.
• The operational gas inlet pressure and the gas rate as
described in Section 7.5.1.
• The combustion performance as described in 'Check the
Combustion Performance' below.
3. Competence to carry out Checking Combustion
Performance B.S. 6798 'Specification for Installation &
Maintenance of Gas Fired Boilers not exceeding KWh' advises
that:-
• The person carrying out a combustion measurement should
have been assessed as competent in the use of a flue gas
analyser and the interpretation of the results.
• The flue gas analyser used should be one meeting the
requirements of BS7927 or BS-EN50379-3 and be calibrated
in accordance with the analyser manufacturers' requirements.
• Competence can be demonstrated by satisfactory completion
of the CPA1 ACS assessment, which covers the use of
electronic portable combustion gas analysers in accordance
with BS 7967, Parts 1 to 4.
4. Check the Combustion Performance (CO/CO 2 ratio)
Set the boiler to operate at maximum rate as described
in Section 7.4.
5. Remove the plug from the flue sampling point, insert the
analyser probe and obtain the CO/CO 2 ratio. This must be less
than 0.004. If the combustion reading (CO/CO 2 ratio) is greater
than this, and the integrity of the complete flue system and
combustion circuit seals has been verified, and the inlet gas
pressure and gas rate are satisfactory either:-
• Perform the 'Standard Inspection and Maintenance' (Section
10.2) & re-check.
• Perform 'Setting the Gas Valve' (Section 10.3.25) & re-check.
• Replace and set the gas valve (Sections 10.3.24 & 25) &
re-check.
7219706 - 01 (04/15)