Superior WRT6036RS Installation And Operation Instructions Manual page 12

Indoor wood burning fireplace
Table of Contents

Advertisement

17" Min.
1" Min.
1" Min.
Pitch
Slope Opening
Flat
0-6/12
26.6°
6/12-
45.0°
12/12
Roof Opening 36" Models
19.5" Min.
2" Min.
2" Min.
Pitch
Slope Opening
Flat
0-6/12
26.6°
6/12-
45.0°
12/12
Roof Opening 42" and 50" Models
Figure 15 - Roof Opening Measurements
12
VENTING INSTALLATION Continued
30" Min.
1" Min.
Opening "A"
Used Flashing
"A" Max.
Model No.
17"
V6F-10DM
19"
V6F-10DM
24"
V12F-10DM
30" Min.
2" Min.
Opening "A"
Used Flashing
"A" Max.
Model No.
19.5"
V6F-10DM
22'
V6F-10DM
27"
V12F-10DM
Superiorfireplaces.US.com
FLASHING INSTALLATION (V6F-10DM OR V12F-10DM)
Determine the flashing to be used with the roof opening chart. Slide
flashing over pipe until base is flat against roof. Replace as many
shingles as needed to cover exposed area and flashing base. Secure
in position by nailing through shingles (see Figure 16). DO NOT NAIL
THROUGH FLASHING CONE.
Installing Flashing on a Metal Roof
When installing the flashing on a metal roof, it is required that putty
tape be used between the flashing and the roof. The flashing must be
secured to the roof using #8 x 3/4" screws and then sealed with roof
coating to prevent leakage through the screw holes. A roof coating
must also be applied around the perimeter of the flashing to provide
a proper seal.
Storm Collar
Flashing
Cone
Nail Only
Outer
Perimeter
of Flashing
Underlap Shingles
at Bottom
Figure 16 - Flashing Installation
Storm Collar Installation (SC2-1)
Place storm collar over pipe and slide down until it is snug against
the open edge of the flashing (see Figure 17). Apply waterproof caulk
around the perimeter of the collar to provide a proper seal.
Chimney
Pipe
Storm
Collar
Figure 17 - Storm Collar
Overlap
Shingles Top
and Sides Only
Waterproof
Caulk
Flashing
126595-01C