Adjustments - Scotsman C1448R Installation And User Manual

Remote condenser modular cuber prodigy plus d series
Hide thumbs Also See for C1448R:
Table of Contents

Advertisement

C1448, C1848, C2148 D Series
Remote Condenser Models - User Manual

Adjustments

Bridge Thickness - For A Service Tech Only
1. Push and hold Off till the machine stops.
2. Remove evaporator cover.
3. Remove left curtain.
4. Use a box wrench and rotate the bridge thickness
adjustment screw in 1/8 turn increments CW to
increase bridge thickness.
5. Rotate CCW to decrease bridge thickness.
Caution: Do not make the bridge too thin or the
machine will not harvest properly. Bridge thickness
adjustments are not covered by warranty.
6. Return curtain to its normal position.
7. Push and release the On button. Check next
harvest of ice. Repeat steps 1-6 if needed.
Water purge setting
The water purge is factory set to the automatic
position, suitable for most water conditions. The
setting can be changed to one of 5 manual settings or
left on automatic.
Purge
1 -
setting
Minimum
Water
RO
Type
water or
equivalent
To set:
1. Switch the machine OFF by holding the Off button
in until a number or the letter A shows on the display.
2. Press and release the On button repeatedly until
the number on the display corresponds to the desired
setting.
3. Press and release the Off switch again to return to
the normal control state.
2 -
3 - Standard
Moderate
Factory
Setting for
typical water
1/8 - 3/16" bridge
Too Big
Just Right for
Small Cube
Ice Bridge Thickness Check
4 -
Heavy
December 2014
Page 16
Just Right for
Medium Cube
Ice Thickness Sensor
5 -
A - Automatic
Maximum
High TDS
Any with conductivity
water
not less than 10
microSiemens/cm
Too
Thin

Advertisement

Table of Contents
loading

This manual is also suitable for:

C1848rC2148r

Table of Contents