Adjustments - Scotsman CU1526MA-6 Installation Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

Adjustments

Bridge Thickness - For the Service Tech Only
1. Remove left louver, locate controller on and off
switches.
2. Push and hold Off till the machine stops.
3. Remove curtain.
4. Use a hex wrench and rotate the bridge
thickness adjustment screw in 1/8 turn
increments CW to increase bridge thickness.
Rotate CCW to decrease bridge thickness.
Caution: Do not make the bridge too thin or the
machine will not harvest properly. Bridge thickness
adjustments are not covered by warranty.
5. Return curtain and louver to their normal
positions.
6. Push and release the On button. Check next
harvest of ice. Repeat steps 1-6 if needed.
Water Purge Setting
The water purge is factory set to the automatic
position, suitable for most water conditions. The
setting can be changed to one of 5 manual settings
or left on automatic.
Purge
1 - Minimum
setting
Water
RO water or
Type
equivalent
To set:
1. Switch the machine OFF by holding the Off
button in until a number or the letter A shows
on the display.
2. Press and release the On button repeatedly
until the number on the display corresponds to
the desired setting.
3. Press and release the Off switch again to
return to the normal control state.
2 -
3 -
Moderate
Standard
Low TDS
Use for
non - RO
typical
water
water
2007
Page 9
CU1526, CU2026, CU3030
3 - 4 mm
bridge
Too Big
Just Right
Ice Bridge Thickness Measurement
Bridge Thickness Adjustment Mechanism
4 - Heavy
5 - Maximum
High TDS
Very High
water
TDS water
Note: Water cooled models, the refrigeration
system discharge pressure is factory set at 245
PSIG or 1700 kPa (gauge) or 17 Bar, which should
yield a freeze cycle discharge water temperature of
about 50 - 43 degrees C. Adjust if necessary.
Installation Manual
Too Small
Adjustment
Screw
A - Automatic
Any with
conductivity not
less than 10
microSiemens/cm

Advertisement

Table of Contents
loading

Table of Contents