Download Print this page

Ferroli F24 Installation, Service And User Instructions Manual page 35

Copper wall-mounted combination, gas fired boiler for central heating and domestic hot water production, fan assisted, room sealed compartment, electronic flame ignition and control

Advertisement

7.14
Pump (fi g. 40)
Replacement of pump head
• Isolate electricity and fl ow and return pipes
• Remove casing (two screws bottom rear corners).
• Remove the two securing screws and lower control
panel
• Release pressure from boiler via pressure relief valve
• Unplug the pump lead "A" from the pump head
• Place a piece of cloth or other absorbent material
over the rear of the control panel to catch any
drops of water that may fall when the pump head
is removed.
• Using a 4mm allen wrench undo the four allen screws
"B" in the pump head, lift away pump head from
the pump body
• fi t new head into pump body and secure with the
allen screws tightening evenly.
• Replace electrical connection.
Replacement of pump od (fi g. 40)
• Proceed as for removal of pump head
• Disconnect the expansion vessel connecting pipe "E"
from the rear of the pump body by removing the clip
from the left hand side
• Disconnect the boiler return pipe
• Disconnect the pump to heat exchanger connection
by removing the clip "F"
• Unscrew the nut on bottom of pump "D"
• Turn the pump body through 90°, pull the bottom
forward and withdraw the pump body
• Reassemble in reverse order taking care to ensure the
O-rings are in place and undamaged.
7.1 Remo al of heat e chan e
• Isolate gas, water and electricity supplies
• Remove casing ( screws bottom corners)
• Remove the two securing screws and lower control panel
• Drain heat exchanger for both
• Remove sealed compartment front panel
• Disconnect the overheat thermostat and central heating limit thermostat
• Remove the main burner, fan, fl ue hood and fl ow meter as described previously
• Remove the pump to heat exchanger fl ow connection and locknut
• Undo the domestic water outlet connection and locknut
ift out heat exchanger
• Re-assemble in reverse order
A
D
Fig. 40
35

Advertisement

loading