Download Print this page

Ferroli F24 Installation, Service And User Instructions Manual page 12

Copper wall-mounted combination, gas fired boiler for central heating and domestic hot water production, fan assisted, room sealed compartment, electronic flame ignition and control

Advertisement

3.01 Drilling Template (Top Flue Application)
Select suitable mounting position for boiler, using the template mark fl ue outlet and boiler mounting points. Drill
two 10mm holes 70mm deep to accept the wall plugs. Fit standard wall plugs on the left and right side and the special
wall plug in the middle (fi g. 13a). Fix the wall bracket to the wall using standard lock nut (M8) on both sides. Mount
the boiler on the wall bracket and fi x using the special antitheft nut (M8) as described in the fi g. 13a. Using a core
drill cut a 118mm diameter hole for the fl ue.
1.
CH fl ow
2
Safety Valve
.
D
m
s
ic h
r
u
3
e
t
t
ate
.
o
o
w
o
G
pp
s su
4
a
ly
.
D
m
s
ic h
r i
5
e
t
t
ate
nlet
.
o
o
w
r
ur
6
et
n
.
CH
12
tlet
Fig. 13a
Ø118
200
Ø3/4"
Ø1/2"
Ø1/2"
Ø1/2"
Ø1/2"
1
2
3
4
5
269
0
1 1
150 min
Ø3/4"
6
5 min
Fig. 13b

Advertisement

loading