Wall Mounting Template; Preparing The Wall - IDEAL Henrad WH 30 FF Installation And Servicing Manual

Wall hung, fanned flued, gas fired boiler
Hide thumbs Also See for Henrad WH 30 FF:
Table of Contents

Advertisement

9
FLUE ASSEMBLY - Exploded View
1. An optional flue
duct extension kit
is required for
wall thicknesses
greater than
600mm (23
")
1/2
Refer to Frame 8.
2. When cutting the
ducts, always use
the cardboard
support rings
provided.
IMPORTANT.
100 FF models only
The flue extension
tube includes an air
deflector ring.

10 WALL MOUNTING TEMPLATE

Note. The template shows the positions for the fixing holes
and the flue hole centres for standard installation. Care must
be taken to ensure the correct holes are drilled.
1. Separate the templates.
2. Tape the templates into the selected position.
3. Ensure squareness by hanging a plumb line as shown.
4. Mark onto the wall (if required) the following:
a. The wall mounting plate screw positions (choose
one from each group). Note. Mark the centre of the
flue hole as well as the circumference.
b. The position of the flue duct hole.
c. Downward pipe routing bracket screw positions.
5. Remove the templates from the wall.

11 PREPARING THE WALL

IMPORTANT. Ensure that, during the cutting operation,
masonry falling outside of the building does not cause
damage or personal injury.
1. Cut the flue hole, preferably with a 125mm (5") core
boring tool, ensuring that the hole is square to the wall.
If the hole has been quite accurately cut with a drill
then making good the wall faces is not essential as
seals are provided at both ends of the flue. However,
both wall faces immediately around the cut hole should
be flat; make good if necessary. For less accurate
holes make good to approximately 125mm (5")
diameter at the 2 wall faces.
2. Drill 4 holes for the wall mounting plate with an 8mm
(
") masonry drill. If the stand-off brackets are used
5/16
ensure the correct holes are chosen.
3. Insert the plastic plugs provided.
12
INSTALLATION
Note. Check all of the hole
positions BEFORE drilling
LEGEND
1. Terminal.
2. Weather seal.
3. Flue assembly.
4. Boiler sealing ring
5. Flue extension tube.
Note. If the
terminal is to be
sited within 25-
40mm of a corner
or vertical pipe
(refer to Table 3)
then the hole
MUST be
accurately cut and
the rubber
weather seal
trimmed around
the groove
provided.
The terminal wall
plate need not be
fitted.
Henrad WH
-
FF
Installation

Advertisement

Table of Contents
loading

Table of Contents