8.0
Installation – page 22
8.7
Making The Electrical Connections
1.
The electrical connections are on the left hand side of
the unit.
2.
Undo the two screws securing the small cover and
remove the cover (Fig. 29).
3.
Undo the two screws securing the L/N/E cable clamp
and place to one side (Fig. 30).
4.
If fitting an integral timer kit please refer to kit
instructions at this stage.
5.
Route the incoming electrical cable/s over the top edge
of the support bracket. This will prevent damage to the
cables.
6.
Lay the cable/s through the cable clamp to gauge the
length of cable required when the plug is connected.
7.
Connect the (L), (N) and (E) wires to the 10-way
terminal block (Fig. 31) and refit the cable clamp.
8.
The incoming cable/s can be routed through the cable
clip at the left hand side of the support bracket.
9.
Check the electrical installation for; earth continuity,
short circuits, resistance to earth, correct polarity and
fuse failure.
8.8
Connecting an External Timer
(Figs 32 & 33)
1.
To connect the mains supply to a timer, connect the
timer live and neutral into L
10-way terminal block.
2.
To connect an external timer voltage free switch circuit,
remove the link wire between terminals 1 & 2 and
connect the switch circuit.
3.
Terminal 1 delivers a mains voltage signal to be
switched by the external controls.
4.
To connect a timer with a switch that is internally linked
to live, remove the link wire between terminals 1 and 2
and connect the switch output back to terminal 2.
5.
A cable clamp is provided for incoming cables.
. and N
indicated at the
T
T