Installation Instructions Page No - Potterton LPG 50e Installation And Servicing Manual

Fanned balanced flue gas fired boilers
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS - Page 11
It is the law that all gas appliances are installed and
serviced by competent persons as stated in Gas Safety
(Installation and Use) Regulations 1994.
For Health and Safety information see back page.
Electrical installation and servicing should be carried out by
a competent person in accordance with the I.E.E. Wiring
Regulations.
The boiler and its associated equipment will arrive on site in
two cardboard cartons. The contents of each carton is as
follows.
CARTON 1:- Boiler Pack
Boiler
Template
Literature Pack Containing:-
Installation and Servicing Instructions
User's Instructions
Control Systems Pipework and Wiring Guide
Auxiliary Pack Containing:-
Boiler Mounting Bracket
Gas Service Cock and Accessory Packs
FIG. 9 TEMPLATE
Place template in proposed boiler position ensuring it is
level (the minimum side clearances are automatically
allowed for)
REAR FLUING
Mark holes 'A', 'B', 'D', large flue outlet hole and side of
boiler reference lines throught slots 'C'.
SIDE FLUING
Mark hole positions 'A', 'D' and side of boiler reference lines
through slots 'C'.
Mark large flue outlet hole and holes 'B' using the thick lines
on the template for minimum clearance at the rear of the
boiler and the thin dotted lines for maximum clearance. See
NOTE on FIG. 1.
CARTON 2:- Flue System Pack
Standard and 2 metre Horizontal Flue Packs
Air/Flue Duct Assembly (length as ordered)
Flue Elbow Extension
Flue Terminal
Flue Sealing Collar
Rope Sealing Ring
Side Infill Panels-2 off
Vertical Flue Pack (2 cartons)
Air/Flue Duct Assembly Flue Terminal
Terminal Cowl
Vertical Flue Adapter
Accessory Pack
Side Infill Panels-2 off
Flue Installation Instructions
FIG. 10 BOILER MOUNTING PLATE
Remove template and carefully cut flue outlet hole through
wall. If necessary make good around hole to enable holes
'B' to be drilled. (If internal flue fitment kit is being used refer
to instructions supplied with kit).
Drill holes 'A' using a 7 mm drill
Drill holes 'B' and 'D' using a 5 mm drill
Using wall plugs, screws and washers (accessory pack A)
attach boiler mounting plate to wall. Ensure that it is level
and the correct way up, i.e. to provide the clearance at the
rear of the boiler allowed for when marking out using the
template. See also NOTE on FIG. 1.
Insert wall plugs into holes 'B' (accessory pack B) and hole
'D' (accessory pack D).
Insert flue sealing collar into wall and secure with screws
provided, (accessory pack B). Make good the internal wall
surface around flue sealing collar.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lpg 60eLpg 80e

Table of Contents