Installation Instructions - Potterton PROFILE LPG 100e Installation And Servicing Instructions

Fanned balanced flue gas fired boiler
Hide thumbs Also See for PROFILE LPG 100e:
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS - Page 11
It is the law that all gas appliances are installed and serviced
by competent persons as stated in Gas Safety (Installation
and Use) Regulations 1994. For Health and Safety
information see back page.
Electrical installation and servicing should be carried out by
a competent person in accordance with the I.E.E. Wiring
Regulations.
The boiler and its associated equipment will arrive on site in
two cardboard cartons. The contents of each carton is as
follows.
CARTON 1:-
Boiler
Template
Literature Pack Containing:-
Installation and Servicing Instructions
User's Instructions
Control Systems Pipework and Wiring Guide
Auxiliary Pack Containing:-
Boiler Mounting Bracket
Gas Service Cock and Accessory Packs
Spring Clip
FIG. 9 TEMPLATE
Place template in proposed boiler position ensuring it is level
(the minimum side clearances are automatically allowed for).
REAR FLUING
Mark holes 'A', 'B', 'D', lage flue outlet hole and side of boiler
reference lines through slots 'C'.
SIDE FLUING
Mark holes positions 'A', 'D' and side of boiler reference lines
through slots 'C'.
Extend Horizontal line from top of the boiler to side wall.
Mark large flue outlet hole and holes 'B' using the thick lines
on the template for minimum clearance at the rear of the
boiler and the thin dotted lines for maximum clearance. See
NOTE on FIG. 1.
Supplied By www.heating spares.co Tel. 0161 620 6677
CARTON 2, Flue System Pack:-
STANDARD OR 1 METRE HORIZONTAL FLUE SYSTEMS
Air/Flue Duct Assembly (length as ordered)
Flue Elbow Extension
Flue Terminal
Flue Sealing Collar
Rope Sealing Ring
Side lnfill Panels-2 off
1 METRE VERTICAL FLUE SYSTEM (consists of two
cartons)
Air/Flue Duct Assembly
Flue Terminal
Side lnfill Panels-2 off
Terminal Cowl
Vertical Flue Adapter
Accessory Pack
Flue Installation Instructions
Optional Components will be supplied in Separate Cartons
FIG. 10 BOILER MOUNTING PLATE
Remove template and carefully cut flue outlet hole through
wall. If necessary make good around hole to enable holes 'B'
to be drilled. (If internal flue fitment kit is being used refer to
instructions supplied with kit).
Drill holes 'A' using a 7 mm drill
Drill holes 'B' and 'D' using a 5 mm drill
Using wall plugs, screws and washers (accessory pack A)
attach boiler mounting plate to wall. Ensure that it is level
and the correct way up, i.e. to provide the clearance at the
rear of the boiler allowed for when marking out using the
template. See also NOTE on FIG. 1.
Insert wall plugs into holes 'B' (accessory pack B) and hole
'D' (accessory pack D). Bend the tags to 90 deg. and insert
flue sealing collar into wall and secure with screws and
washers provided. (accessory pack B). Make good the
internal wall surface around flue sealing collar.
Publication No. 559876/0296

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents