Installation Instructions - Potterton Prorile Prima 30e Installation And Servicing Instructions

Fanned balanced flue gas fired boilers
Hide thumbs Also See for Prorile Prima 30e:
Table of Contents

Advertisement

It is the law that all gas appliances are installed and
serviced by competent persons as stated in Gas Safety
(Installation and Use) Regulations 1984.
For Health and Safety Information see back page.
The boiler and its associated equipment will arrive on site in
two cardboard cartons. The contents of each carton is as
follows.
CARTON 1:- Boiler Pack
Boiler
Template
Literature Pack Containing:- Installation and Servicing
Instructions
User's Instructions
Control Systems Pipework and Wiring Guide Auxiliary Pack
Containing:-
Boiler Mounting Bracket
Gas Service Cock and Accessory Packs
FIG. 8 TEMPLATE
Place template in proposed boiler position ensuring it is level
(the minimum side clearances are automatically allowed for)
REAR FLUING
Mark holes 'A', 'B', 0', large flue outlet hole and side of boiler
reference lines throught slots C'.
SIDE FLUING
Mark hole positions 'A', 'D' and side of boiler reference lines
through slots 'C'.
Mark large flue outlet hole and holes B' using the thick lines on
the template for minimum clearance at the rear of the boiler
and the thin dotted lines for maximum clearance.
See NOTE on FIG. 1.
INSTALLATION INSTRUCTIONS - Page 11
CARTON 2:—Flue System Pack
Horizontal Flue Packs
Air/Flue Duct Assembly (length as ordered)
Flue Elbow Extension
Flue Terminal
Flue Sealing Collar
Rope Sealing Ring
Side Infill Panels—2 off
Vertical Flue Pack (2 cartons)
Air/Flue Duct Assembly
Flue Terminal
Terminal Cowl
Vertical Flue Adapter
Accessory Pack
Side Infill Panels—2 off
Flue Installation Instructions
FIG. 9 BOILER MOUNTING PLATE
Remove template and carefully cut flue outlet hole through
wall. If necessary make good around hole to enable holes 'B'
to be drilled. (If internal flue fitment kit is being used refer to
instructions supplied with kit).
Drill holes 'A' using a 7 mm drill
Drill holes 'B' and 'D' using a 5 mm drill
Using wall plugs, screws and washers (accessory pack A)
attach boiler mounting plate to wall. Ensure that it is level and
the correct way up, i.e. to provide the clearance at the rear of
the boiler allowed for when marking out using the template.
See also NOTE on FIG. 1.
Insert wall plugs into holes 'B' (accessory pack B) and hole 0'
(accessory pack D).
Insert flue sealing Collar into wall and secure with screws
provided, (accessory pack B). Make good the internal wall
surface around flue sealing collar.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents