CX-LDB30/LDB50
3-12. LEVER (LOADING R/L)
1
1
torsion spring (loading LV)
torsion spring (loading RV)
5 lever (loading-R)
2 two hooks
4 two hooks
3 lever (loading-L)
PRECAUTION DURING LEVER (LOADING R / L) INSTALLATION
Align the horizontal position.
lever (loading-L)
lever (loading-R)
Install the
both levers so that they move symmetrically.
13