The Site Prep Team - HP StorageWorks XP128 Installation Manual

Hide thumbs Also See for StorageWorks XP128:
Table of Contents

Advertisement

The site prep team

14
The site prep planning team is responsible for determining site location and
location size, ensuring that construction requirements and local codes are
met, and scheduling all events related to site completion to prepare for the
successful installation and maintenance of the HP Disk Array XP128. The
site prep team consists of the following personnel:
The HP Sales Representative (SR)
The sales representative is your primary point of contact. A sales
representative coordinates all the HP resources to ensure successful
delivery and installation of your disk array.
The HP Customer Engineer (CE)
The HP CE is trained and experienced in the installation of your disk array.
He or she has the tools, parts, and knowledge to install and maintain your
HP Disk Array XP128. The CE will also assist you in determining your site
prep requirements.
The HP Application Software Engineer (ASE)
The HP ASE is a software technical specialist trained in configuring your
HP Disk Array XP128. The ASE can install and configure all software
applications for your disk array.
The Customer
As part of the site prep planning team, your responsibilities include
scheduling, planning, and preparing a suitable environment for the HP Disk
Array XP128. Your site team may include a site specialist for your
computer room, a site electrician, and other site personnel specializing in
your site computer room. Responsibilities include proper:
• Physical space necessary for proper disk array function and
maintenance activity, including space and weight limitations and
system accessibility
HP StorageWorks Disk Array XP128: Site Preparation Guide

Advertisement

Table of Contents
loading

Table of Contents