Liebert UPS User Manual page 16

6 & 10 kva 208v & 240v
Table of Contents

Advertisement

STABILIZERS / LEVELING FEET
When the UPS is located in its final position before or after wiring, it is necessary
to fit stabilizer brackets and, if necessary, adjust the leveling feet. If the UPS is
wired using a rigid wiring system, then movement of the UPS must be prevented
by winding down the 4 leveling feet under the UPS as shown below. For UPS
wired with flexible cables, this is optional. Note - Access to the leveling feet is
obstructed by the stabilizer brackets, on the GXT10000 models.
Adjust the leveling feet as necessary using a 12mm open ended
spanner/wrench. DO NOT LOOSEN THE LARGER NUT ABOVE, AS THIS
FIXES THE LEVELING FEET TO THE CHASSIS
Attach the stabilizing brackets as follows.
GXT6000 models:
1.
Using a Phillips-head screwdriver, remove the screws(4) from each of the
bottom corners of the side panels.
2.
Attach the stabilizing brackets to each corner using screws just removed.
GXT10000 models :
1.
Using a Phillips-head screwdriver, remove the three inner-most screws at
the base of both side panels.
2.
Attach the stabilizers fixing with the screws just removed.
10 kVA
Leveling Feet Adjustment Diagram
6 kVA
12 mm
16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents