Section 3: Finishing - Montigo R320-ST Installation & Maintenance Manual

R-series-st indoor residential fireplace
Hide thumbs Also See for R320-ST:
Table of Contents

Advertisement

R320-ST & R420-ST Power Vent Indoor Gas Fireplace
Section3:Finishing
Step1:Removescrewsfromperimeterofglassasshown
below. The screws will be used to fasten the cement board,
provided by Montigo, to the unit in the finishing stages. Remove
the marked screws above and below the glass. Place provided
Front View
Figure 1 Sec.3 R320 Fireplace Screw Locations. Both Sides are Typical.
Front View
Figure 2 Sec.3 R420 Fireplace Screw Locations. Both Sides are Typical.
Step2. Back-framing the Fireplace; installing 2 x 4's, (Typical Both
sides). Ensure you have the required 2 x 4's to complete the project.
Cut Four (4) - 2 x 4's to fit under the front & rear fireplace throat,
(horizontal), fit & remove. These must be no closer than 3" below
the bottom edge of glass. Next, cut the short 2 x 4's, to fit at each
end under the previous Horizontals.
Non-combustible Header
(Supplied by Montigo)
First wood header installed
at 19" from top of glass
3" Clearance to
combustibles
First
combustible
(2) 2X4s
3" Clearance
to combustibles
Figure 3 Sec.3 Fireplace installation, (Ensure you maintain the 3" clearance to combustibles) Both Sides are Typical.
Page 10
Installation
R320
3 Screws Top
&
3 Screws
Bottom
R420
4 Screws Top
&
4 Screws
Bottom
2 X 4, (Top
Space between
2 x 4s
Horizontal)
R320 = 47½"
R420 = 59½"
2 X 4 fillers, (Vertical) use typical
building practices when spacing
template to check screw hole positioning. Transfer template to
provided cement board to pre drill pilot holes. Refer to figures
below for Screw locations.
Note: Images are shown without screens for clarity
purposes. However, your fireplace should not be
operated without proper installation of screens.
Side View
Side View
Next, cut the required quantity of short filler 2x4's under the lower
Horizontal. The number of pieces will be determined by the length,
and model of fireplace. (Follow Typical building codes and practices
when spacing). Next, cut the Required Left and Right Vertical 2 x 4's
and space at 3" from side of apron. Install the Two Non-combustible
Headers (one per side), supplied by Montigo, as per Figure 3.
2 X 4, (Bottom
2-pcs 2 x 4, (vertical)
Horizontal)
Both Sides Typical
3" Clearance
to combustibles
Space supplied
Non-Combustible Header(s)
to allow 6" of Cement board
to be fastened to
1"
Clearance
1"
Clearance
XG0774 - 150121
Both
Sides
Typical

Advertisement

Table of Contents
loading

This manual is also suitable for:

R420-st

Table of Contents