FIREPLACE FRAMING

Firebox framing can be built before or after the appliance is set in place. Construct firebox framing following Figure 2 and
the chart below for your specific installation requirements. See Figure 3 on Page 8 for firebox dimensions. The framing
headers may rest on the top of the firebox standoffs. Do not bring headers below top of standoffs.
The firebox may be installed directly on a combustible floor or raised on a platform of an appropriate height. When the
firebox is installed directly on carpeting, tile, or other combustible material, other than wood flooring, the firebox shall be
installed on a metal or wood panel extending the full width and depth of the enclosure.
Do not fill spaces around firebox with insulation or other materials. This could cause
a fire.
Corner Installation
B
A
Stud Location
54D5032
D
C
A
E
Figure 2 - Framing Dimensions
Figure 2 - Framing Dimensions
PRE-INSTALLATION INFORMATION
F
Inside Chase Installation
300
400
1
1
A
33
/
"
37
/

1
7
B
37
/
"
40
/
4
C
28
1
/
"
9
1
/
4
1
1
D
14
/
"
13
/
8
E
55
11
/
"
60
7
/
16
13
7
F
7
/
"
30
/
16
16
G
13
3
/
"
16
1
/
4
3
1
H
39
/
"
43
/
8
16
C
A
C
A
Recessed
Installation
"

"
8
"
4
"

"
8
"
"

"
G
7