DVB Series Direct Vent Gas Fireplace
FIReBox FRAMING
Firebox framing can be built before or after the appliance is set in place. Construct firebox
framing following Figure 2 and the chart below for your specific installation requirements. See
Figure 3 on page 8 for firebox dimensions. The framing headers may rest on the top of the
firebox standoffs. Do not bring headers below top of standoffs.
The firebox may be installed directly on a combustible floor or raised on a platform of an appropri-
ate height. When the firebox is installed directly on carpeting, tile, or other combustible material,
other than wood flooring, the firebox shall be installed on a metal or wood panel extending the
full width and depth of the enclosure.
Do not fill spaces around firebox with
insulation or other materials. this
could cause a fire.
FP2125
corner Installation
B
stud location
8
FP2126
stud locations
D
C
A
E
FP2125
corner installation
FP2126
A
Figure 2 -
Framing Dimensions
A
33Z\x"
B
37Z\v"
C
28Z\v"
D
14Z\,"
E
55ZZ\zn"
F
27ZC\zn"
F
G
13C\v"
G
H
39C\,"
Inside chase Installation
FP2127
Recessed Installation
FP2127
wall installs
FIReplAce FRAMING
300
400
500
37Z\x"
41Z\x"
40M\,"
40M\,"
29Z\v"
33Z\v"
14B\,"
16B\,"
60M\,"
64M\,"
30M\zn"
32M\zn"
15C\v"
15C\v"
43Z\zn"
45M\,"
C
A
C
A
600
47Z\x"
40M\,"
39Z\v"
19B\,"
70M\,"
35M\zn"
15C\v"
50Z\,"
G
1/2" or 5/8"
G
1/2" or 5/8"
54D0701