3.3. OPT engine assembly and blower wire alignment
1. First screw constrain
3. Third screw constrain
3.4. Power board assembly and power board wire alignment
ViewSonic Corporation
To keep the blower wire under
the heat sink of OPT engine.
58
2. Second screw constrain
Confidential - Do Not Copy
PJ513D-1