4. Assembly Baffle Stop AL
4.1. Assemble Baffle Stop AL on HSG DMD and fasten screw (Fig. 4-1)
5. Assembly LP Module
5.1 LP must datum well with "BKT_LP" show as Figure 5-1
5.2 Referring to Figure 5-2,there must be visible clearance between "BKT_LP" and "LP
opening" after assembly。
5.3 Glue "LP" and "BKT_LP" with ""UV5503 Glue" at two opening of "BKT_LP" show in Figure
5-3.
5.4 UV-5503 Glue curing process and concerns:
vi. The UV-glue must fill up the whole opening area (shown in Figure 5-3) to contact well
ViewSonic Corporation
Fig. 4-1
TOP Datum
RIGHT Datum
Fig. 5-1
41
Fig.5-2
Confidential - Do Not Copy
Clearance
PJ513D-1