Chamberlain 5410E 2013 Owner's Manual page 13

Table of Contents

Advertisement

ASSEMBLY STEP 4
For Sliding and Swinging Gates Only
Install the Chain
1. Dispense a few inches of chain
from carton and fasten to trolley
with a master link from the
hardware bag. (Figure 1).
• Push pins of master link bar
through chain link and hole in
front end of trolley.
• Push master link cap over pins
and past pin notches.
• Slide clip-on spring over cap and onto pin notches until both
pins are securely locked in place.
2. To prevent the trolley from jamming against the opener during
operation, position trolley 5 to 15 cm from the stop hole as
shown. Then dispense the chain around the opener sprocket
(Figure 1). Make sure the sprocket teeth engage the chain.
• Proceed around to the chain sprocket bracket and forward to
the threaded trolley shaft.
3. Use the second master link to connect the chain to the fl at end
of the shaft (Figure 1). Check to make sure the chain is not
twisted.
Figure 1
Install Chain
Install Chain
and Cable
In This Direction
in this Direction
Sprocket
Deje la cadena y
Leave Chain
el cable dentro d
Inside Carton to
cartón para evita
Prevent Kinking
que se tuerzan.
Keep Chain Taut When
Mantenga tensos el cable
la cadena mientras los alimente.
Dispensing
Mounting
Plate
To avoid possible SERIOUS INJURY to fi ngers from moving
opener:
• ALWAYS keep hand clear of sprocket while operating opener.
• Securely attach sprocket cover BEFORE operating.
Flat End of Trolley
Threaded Shaft
Motor Unit
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents