Prepare Boiler Location - Weil-McLain Gold GV Manual

Series 4
Hide thumbs Also See for Gold GV:
Table of Contents

Advertisement

Ia
Overview of this
section
8
GOLD GV W
GOLD GV W
ater Boiler — Series 4
ater Boiler — Series 4
GOLD GV Water Boiler — Series 4
GOLD GV W
GOLD GV W
ater Boiler — Series 4
ater Boiler — Series 4
Prepare boiler location — overview
Verify the boiler installation will meet all applicable
If the boiler installation is at
obtain and install the high altitude kit. Obtain the high altitude kit and
review the instructions included. Note the venting restrictions and input
reductions at altitudes over 5,500 feet.
Check the boiler space to be sure minimum
are available.
Obtain special
venting materials
instructions.
Direct vent installation (outside air piped to boiler) is optional in most
cases. But, if air contamination is likely, you will have to
. Note list of contaminants on page 13.
boiler
If the GV boiler is replacing a boiler that is being removed from a
that will still serve other appliances, follow the procedure in
vent system
this manual to verify vent performance.
codes
(over 5,500 feet) make sure to
high altitude
clearances
and make sure vent will comply with
Part number 550-141-856/0703
.
and accessibility
pipe air to the
combined

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gold gv-3Gold gv-4Gold gv-5Gold gv-6

Table of Contents