Position Boiler - Weil-McLain Gold GV Manual

Series 4
Hide thumbs Also See for Gold GV:
Table of Contents

Advertisement

IIe
22
GOLD GV W
GOLD GV W
ater Boiler — Series 4
ater Boiler — Series 4
GOLD GV Water Boiler — Series 4
GOLD GV W
GOLD GV W
ater Boiler — Series 4
ater Boiler — Series 4
Prepare boiler — place in position

Position boiler

After installing vent starter tee, inspecting (replacing if
necessary) the gas/air orifice and installing the high
altitude kit (if required), move the boiler near its
position.
Figure 6 shows the boiler with the front and top panels
replaced. These panels may be left off if desired until
the installation has been completed.
Refer to Figure 6 for placement sequence:
Wearing heavy gloves
over onto its base rail legs.
Clip the shipping strap
boiler block assembly. Remove the skid and strap.
Attach the
jacket rear panel
#10 x ¾" screws provided in the accessory bag.
Boiler is heavy
sheet metal parts which may have
sharp edges
handling
precautions when moving. Failure
to do so will result in severe personal
injury, death or substantial property
damage.
Part number 550-141-856/0703
, carefully rotate the boiler
securing the skid to the
as shown using (4)
and contains some
.
when
Wear gloves
and
take
proper

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gold gv-3Gold gv-4Gold gv-5Gold gv-6

Table of Contents