GOLD CGa Gas-Fired Water Boiler — Boiler Manual
1b
Prepare boiler location — clearances
opposite the boiler FRONT (see Figure 1b)
These openings must be located as shown in Figure 1b to provide
proper air flow around the boiler. The free area of each opening
(after deducting for louvers) must be at least
of boiler input. If the building is of unusually
tight construction (see page 11 for definition), the air openings
must connect directly to outside or the building must have air
openings to the outside as specified on page 11.
If clearances are equal to or greater than Figure 1a, see pages 10
and 11 for location and sizing of combustion air openings.
Failure to comply can result in severe personal injury, death or
substantial property damage and reduced boiler life.
personal injury, death or substantial property
damage and reduced boiler life.
1.
2.
rial.
3.
recommendation for clearances to combustible material.
Part Number 550-101-009/0107
located on the wall or door
. Failure to comply can result in severe
from combustible material.
from combustible mate-
: refer to vent manufacturer's
1a
.
Foundation
1. Provide a solid brick or minimum 2-inch thick concrete
foundation pad if any of the following is true:
2. Minimum dimensions are
Minimum foundation width:
CGa-25/3
CGa-4
CGa-5
Residential garage installations
Take the following special precautions when installing the
boiler in a residential garage. If the boiler is located in a
of the garage to assure the burner and ignition
devices will be no less than 18 inches above the floor.
by a moving vehicle.
Required MINIMUM clearances
if foundation is used. Fire can result,
causing severe personal injury, death
or substantial property damage.
by:
12"
CGa-6
15"
CGa-7
18"
CGa-8
so it cannot be damaged
21"
24"
27"
7