• Installation • Start-Up • Parts • Maintenance
VIIIb
Check-out procedure — checklist
!
!
!
!
!
!
!
!
!
Boiler model __________________
Measured Btuh input ____________
Installer ________________________
(company)
_______________________________
(installer's signature)
Part number 550-141-856/0703
return to 0 VAC. Control will attempt ignition two more times, increasing igniter time
to 30 seconds for these attempts. The control will then lockout, flashing the
and
lights.
FLAME
e.
To restart system, follow
(Control will reset after power has been off for at least 45 seconds.)
Set limit control(s) to system temperature requirements. Adjust balancing valves and
controls to provide design temperature to system.
For multiple zones, adjust flow so it is about the same in each zone or as required.
Verify thermostat heat anticipator (if available) is set properly? Refer to
manual Section
,
VI
Thermostat(s)
Cycle boiler with thermostat — Raise to highest setting and verify boiler goes through
normal start-up cycle. Lower to lowest setting and verify boiler goes off.
Measure natural gas input:
a.
Operate boiler 10 minutes.
b. Turn off other appliances.
c.
At natural gas meter, measure time (in seconds) required to use one cubic foot of gas.
d. Calculate gas input:
e.
Btuh calculated should approximate input rating on boiler rating label.
Observe several operating cycles for proper operation.
Set room thermostat to desired room temperature.
Fill in

Installation and service certificate

Review all instructions shipped with this boiler with owner or maintenance person. Return
instructions to envelope and give to owner or place in pocket inside front panel in boiler.
Installation and service certificate
Series __________
! Installation instructions have been followed.
! Check-out sequence has been performed.
! Above information is certified to be correct.
! Information received and left with owner/maintenance person.
________________________________
Lighting instructions
.
3600 x 1000
number of seconds from step c
below?
CP number ___________
(address)
(cont.)
on boiler or in manual Section
Field wiring
= Btuh
Date installed _______________
______________________________
(phone)